Orange Santa Fe Depot Specific Plan & Station Area Plan

City of Orange

The Mobility Group worked on a multidisciplinary team to develop a transit-oriented Specific Plan for the Santa Fe Depot area in the City of Orange, centered around the existing Metrolink station, and adjacent to the Downtown plaza area.  The Mobility Group studied the potential for reduced trip generation and parking needs in the TOD, and developed access/circulation plans for all modes at the station and in the Specific Plan area, including a focus on walkable neighborhoods.  We prepared the transportation components of the Specific Plan and the Transportation Study for the EIR.

Orange Santa Fe Depot Specific Plan & Station Area Plan

City of Orange

The Mobility Group worked on a multidisciplinary team to develop a transit-oriented Specific Plan for the Santa Fe Depot area in the City of Orange, centered around the existing Metrolink station, and adjacent to the Downtown plaza area.  The Mobility Group studied the potential for reduced trip generation and parking needs in the TOD, and developed access/circulation plans for all modes at the station and in the Specific Plan area, including a focus on walkable neighborhoods.  We prepared the transportation components of the Specific Plan and the Transportation Study for the EIR.